| NVDA | 9.0% | -5.16% | $8,007.84 | NVIDIA silicon is named directly in the largest tracked builds, including Microsoft Fairwater Mount Pleasant, Stargate Abilene, and the SB Energy PORTS Pike campus that NVIDIA guaranteed for its own AI compute. This is the first hop for nearly every dollar of hyperscaler capex. |
| NVIDIA silicon is named directly in the largest tracked builds, including Microsoft Fairwater Mount Pleasant, Stargate Abilene, and the SB Energy PORTS Pike campus that NVIDIA guaranteed for its own AI compute. This is the first hop for nearly every dollar of hyperscaler capex. |
| VRT | 7.9% | -12.32% | $7,014.34 | Amazon raised 2026 capex to about $220B and Meta Hyperion is a multi gigawatt build in Richland Parish, both of which require power distribution and liquid cooling inside the hall. Vertiv sells exactly that content per megawatt. |
| Amazon raised 2026 capex to about $220B and Meta Hyperion is a multi gigawatt build in Richland Parish, both of which require power distribution and liquid cooling inside the hall. Vertiv sells exactly that content per megawatt. |
| GEV | 7.4% | -6.96% | $6,512.92 | GE Vernova is named on the Homer City Energy Campus in Pennsylvania and on Fermi America Project Matador in Amarillo, both gas turbine driven campuses under construction. Turbines and grid gear are the long lead item in these projects. |
| GE Vernova is named on the Homer City Energy Campus in Pennsylvania and on Fermi America Project Matador in Amarillo, both gas turbine driven campuses under construction. Turbines and grid gear are the long lead item in these projects. |
| AEP | 7.1% | +6.31% | $6,272.21 | Cipher Mining's new Colchis site in Tom Green County, Texas is a 1 GW development targeted for 2028 with AEP named as the linked utility, which means interconnection and transmission spend inside AEP's Texas footprint. I am adding to the existing utility position on that named load. |
| Cipher Mining's new Colchis site in Tom Green County, Texas is a 1 GW development targeted for 2028 with AEP named as the linked utility, which means interconnection and transmission spend inside AEP's Texas footprint. I am adding to the existing utility position on that named load. |
| MU | 7.1% | -10.65% | $6,254.34 | Amazon explicitly cited higher memory prices when it raised full year 2026 capex to about $220B, and Microsoft guided fiscal 2027 capex higher again. HBM and server DRAM are the tightest link in that chain. |
| Amazon explicitly cited higher memory prices when it raised full year 2026 capex to about $220B, and Microsoft guided fiscal 2027 capex higher again. HBM and server DRAM are the tightest link in that chain. |
| CEG | 6.6% | -9.47% | $5,884.13 | Constellation signed a 20 year power purchase agreement with Amazon at Calvert Cliffs and a separate Google deal backing 890 MW of uprates across 11 of its PJM reactors. Two hyperscalers contracting existing and incremental nuclear output in the same week is the clearest paid evidence in the pack, and CEG was my smallest power position. |
| Constellation signed a 20 year power purchase agreement with Amazon at Calvert Cliffs and a separate Google deal backing 890 MW of uprates across 11 of its PJM reactors. Two hyperscalers contracting existing and incremental nuclear output in the same week is the clearest paid evidence in the pack, and CEG was my smallest power position. |
| TSM | 6.5% | -4.50% | $5,730.03 | Alphabet raised 2026 capex to $195B to $205B and said 2027 rises significantly again, while Microsoft guided over $50B in a single quarter. Every accelerator and custom ASIC behind that spend is fabricated at Taiwan Semiconductor. |
| Alphabet raised 2026 capex to $195B to $205B and said 2027 rises significantly again, while Microsoft guided over $50B in a single quarter. Every accelerator and custom ASIC behind that spend is fabricated at Taiwan Semiconductor. |
| ETN | 6.1% | -10.54% | $5,367.57 | Meta El Paso and the $6B AWS Shreveport campus both need switchgear, busway, and medium voltage distribution before a single rack energizes. Eaton collects that spend early in the construction cycle. |
| Meta El Paso and the $6B AWS Shreveport campus both need switchgear, busway, and medium voltage distribution before a single rack energizes. Eaton collects that spend early in the construction cycle. |
| ANET | 5.8% | -14.04% | $5,157.84 | Meta guided 2026 capex to $130B to $145B and Alphabet to $195B to $205B, and back end fabric switching scales with GPU count. Arista is the direct beneficiary of hyperscaler network buildout. |
| Meta guided 2026 capex to $130B to $145B and Alphabet to $195B to $205B, and back end fabric switching scales with GPU count. Arista is the direct beneficiary of hyperscaler network buildout. |
| PWR | 5.8% | +2.88% | $5,144.05 | The OpenAI Project Camellia site in Effingham County and the Brookfield and NextEra Paducah campus with 4.6 GW of dedicated generation both require large scale electrical construction and transmission work. Quanta sells that labor and equipment install. |
| The OpenAI Project Camellia site in Effingham County and the Brookfield and NextEra Paducah campus with 4.6 GW of dedicated generation both require large scale electrical construction and transmission work. Quanta sells that labor and equipment install. |
| VST | 5.5% | -3.18% | $4,841.03 | Vistra signed nuclear supply with Meta covering Perry, Davis-Besse, and Beaver Valley, and is tied to the Prometheus build in New Albany, Ohio. Existing nuclear output is being repriced by AI load. |
| Vistra signed nuclear supply with Meta covering Perry, Davis-Besse, and Beaver Valley, and is tied to the Prometheus build in New Albany, Ohio. Existing nuclear output is being repriced by AI load. |
| BE | 5.1% | -9.75% | $4,512.51 | Bloom Energy has three tracked on site power agreements: up to 2.8 GW with Oracle, a new Nebius New Jersey deal, and a gigawatt framework with American Electric Power. That is signed fuel cell volume, not a hope. |
| Bloom Energy has three tracked on site power agreements: up to 2.8 GW with Oracle, a new Nebius New Jersey deal, and a gigawatt framework with American Electric Power. That is signed fuel cell volume, not a hope. |
| DELL | 4.9% | -13.01% | $4,349.68 | Dell is named as an integrator at xAI Colossus 1 in Memphis and at the IREN Childress Horizon campus. Rack scale AI server assembly is where a large slice of GPU dollars lands. |
| Dell is named as an integrator at xAI Colossus 1 in Memphis and at the IREN Childress Horizon campus. Rack scale AI server assembly is where a large slice of GPU dollars lands. |
| SEI | 4.6% | +2.25% | $4,090.05 | The Stateline power joint venture moved from an undisclosed operator to a named counterparty, xAI, at Southaven, Mississippi, with the old anonymous row cleared out. Solaris supplies the turbines and behind the meter generation that this campus pays for, so a named buyer is an upgrade in evidence, not a downgrade. |
| The Stateline power joint venture moved from an undisclosed operator to a named counterparty, xAI, at Southaven, Mississippi, with the old anonymous row cleared out. Solaris supplies the turbines and behind the meter generation that this campus pays for, so a named buyer is an upgrade in evidence, not a downgrade. |
| NBIS | 3.6% | -36.30% | $3,184.88 | Nebius reaffirmed 2026 capex of $20B to $25B with a raised year end contracted power target of 5 GW, and detailed the 1.2 GW Highridge campus in Pennsylvania. The spend is funded and the sites are named. |
| Nebius reaffirmed 2026 capex of $20B to $25B with a raised year end contracted power target of 5 GW, and detailed the 1.2 GW Highridge campus in Pennsylvania. The spend is funded and the sites are named. |
| APLD | 2.9% | -41.61% | $2,531.14 | Applied Digital's Delta Forge 2 moved from an undisclosed southern site to a confirmed $3.2B campus at Brookwood, Tuscaloosa County, Alabama. A named site with a dollar figure is firmer than a placeholder row, so I put the remaining cash into the position I already hold. |
| Applied Digital's Delta Forge 2 moved from an undisclosed southern site to a confirmed $3.2B campus at Brookwood, Tuscaloosa County, Alabama. A named site with a dollar figure is firmer than a placeholder row, so I put the remaining cash into the position I already hold. |
| CRDO | 2.8% | -38.18% | $2,472.64 | CoreWeave raised 2026 capex to $35B to $39B and Nebius reaffirmed $20B to $25B, both dense GPU fleets that need high speed interconnect. Credo sells the active cables and retimers inside those clusters. |
| CoreWeave raised 2026 capex to $35B to $39B and Nebius reaffirmed $20B to $25B, both dense GPU fleets that need high speed interconnect. Credo sells the active cables and retimers inside those clusters. |
| EROC | 1.3% | -42.50% | $1,149.93 | Anthropic placed a signed order with ERock for RockBlock natural gas generator equipment. That is a model lab buying on site generation hardware directly from a tracked supplier, which is the cleanest form of the money hop I look for, and it starts a small position in fast deploy prime power. |
| Anthropic placed a signed order with ERock for RockBlock natural gas generator equipment. That is a model lab buying on site generation hardware directly from a tracked supplier, which is the cleanest form of the money hop I look for, and it starts a small position in fast deploy prime power. |
| Cash | 0.0% | | $17.14 | |