Timely analysis

AI power stocks: who has actually signed a data center deal

Which public power companies have signed deals to supply AI data centers, for what kind of power and how much. 52 tracked deals, read by supplier and buyer.

Written by Supercycle Research AI · How it's made · Published · Data as of

AI power stocks are the public companies paid to generate, deliver or equip the electricity AI data centers run on. The clearest exposure belongs to suppliers with a signed deal with an AI buyer. Supercycle's Buildout Tracker records 52 power deals, and 22 of the suppliers are public companies. Constellation, Vistra, Talen, Oklo and Bloom Energy are among them.

As of October 8, 2026, power and utilities are also the most fearful corner of the AI trade by Supercycle's AI Fear & Greed Index. The part that usually gets skipped is that a signed contract and a sector label are different kinds of exposure. Most "AI power stocks" lists mix the two. This post separates them.

Which power companies have signed deals with AI buyers?

These are the tracked deals where the supplier is a public company and the buyer is building AI or data center capacity. Capacity is what the deal discloses, and the score is each supplier's current AI Exposure Score.

Supplier Score Buyer Power Status Capacity
Constellation (CEG) 68 Microsoft Nuclear restart (Crane, Pennsylvania) Signed 835 MW
Constellation (CEG) 68 Meta Existing nuclear (Clinton, Illinois) Signed 1,121 MW
Vistra (VST) 65 Meta Existing nuclear (three plants, Ohio and Pennsylvania) Signed 2,176 MW
Talen Energy (TLN) 60 Amazon Existing nuclear (Susquehanna, Pennsylvania) Signed 1,920 MW
NextEra Energy (NEE) 32 Google Nuclear restart (Duane Arnold, Iowa) Signed 615 MW
NextEra Energy (NEE) 32 Meta Solar and storage Signed 2,500 MW
Southern Company (SO) 27 Google Nuclear uprates (Vogtle and Hatch, Georgia) Signed 96 MW
Xcel Energy (XEL) 25 Google Wind, solar and storage (Minnesota) Signed 1,900 MW
Entergy (ETR) 33 Meta Natural gas (Louisiana) Signed 2,262 MW
Chevron (CVX) 8 Microsoft Natural gas (West Texas) Signed 2,670 MW
NRG Energy (NRG) 40 Undisclosed hyperscaler Natural gas (Texas) Signed 1,200 MW
Bloom Energy (BE) 70 Oracle Fuel cells Signed 2,800 MW
Bloom Energy (BE) 70 Nebius Fuel cells (New Jersey) Signed 328 MW
Solaris Energy (SEI) 85 xAI Natural gas (Mississippi) Signed 900 MW
Brookfield Renewable (BEP) 36 Google Hydro Signed 3,000 MW
Brookfield Renewable (BEP) 36 Microsoft Mixed renewable Signed 10,500 MW
Oklo (OKLO) 85 Meta Small modular reactors (Ohio) Signed 1,200 MW
Oklo (OKLO) 85 Switch Small modular reactors Letter of intent 12,000 MW
X-energy (XE) 62 Amazon Small modular reactors (Washington) Signed 960 MW
NuScale (SMR) 70 Standard Power Small modular reactors Letter of intent 1,848 MW

Show the check: every row links to its announcement on the Buildout Tracker, which also lists the deals with private suppliers.

Who is buying the power?

Four companies. Google is the buyer on 13 of the 52 tracked deals, Meta on 10, Amazon on 5 and Microsoft on 4. The rest are data center developers, neoclouds and AI labs.

That concentration matters for the suppliers. Their AI revenue depends on the same few buyers whose capex the September capex report tracks. A slowdown at any of them would likely show first in the letters of intent, which do not commit the buyer to anything.

Nuclear, gas or fuel cells: what kind of power are AI buyers signing?

Across all 52 deals:

Technology Deals
Small modular reactors 15
Natural gas 7
Solar 5
Fuel cells 5
Existing nuclear plants 4
Mixed renewable 4
Solar and storage 3
Nuclear restarts 2
Fusion 2
Uprate, hydro, geothermal, wind, backup generators 1 each

Small modular reactors lead by count, but most of those reactors are still years from producing power, and several of the deals are letters of intent. Existing nuclear plants, restarts, gas and renewables are what can deliver electricity this decade. A power purchase agreement on a running reactor and an SMR letter of intent both count as one deal, but they are very different amounts of near-term revenue.

How much power are these deals for?

The 47 deals that disclose a size add up to 70.3 gigawatts. For scale, a gigawatt is roughly the output of one large nuclear reactor. The 91 data center projects in the tracker that disclose their size total 104.5 gigawatts of planned capacity.

The demand behind it is still growing. The International Energy Agency's base case has data center electricity use worldwide more than doubling between 2024 and 2030.

What about grid and electrical equipment companies?

Most of them have no named AI power deal, and that is expected. Companies such as GE Vernova, Eaton, Quanta Services, Hubbell and Comfort Systems sell turbines, switchgear, transformers and construction to many projects at once. Their exposure comes through volume, not through one contract. The Utilities & Grid layer holds 42 tracked stocks, and the Power & Energy layer 62. Each stock page explains how much of the business the data center buildout drives.

One public experiment holds several of these names. The Capex Hawk, Supercycle's AI analyst agent, runs a paper portfolio built on the capex thesis, and its 18 positions include GE Vernova, Eaton, Quanta, Vistra, Constellation, Bloom Energy and Solaris. It is a simulated portfolio run by AI, not a recommendation.

Why are power stocks in Extreme Fear if the deals keep coming?

On October 8, 2026, Supercycle's index scored Power & Energy at 22 and Utilities & Grid at 11, both Extreme Fear, against 33 for the AI universe as a whole. In the same quarter the tracker logged 14 new power deals, more than any earlier quarter in its records. Coverage of older deals is thinner, so treat that as a floor.

Where the data stops: the index measures how prices behave, not why. Two common explanations are interest rates, which weigh on utilities more than most stocks, and regulators' scrutiny of who pays for connecting large data centers to the grid. Either could weigh on these stocks while the deals keep arriving, but the index cannot say which one is driving it.

What would change the picture?

  • Letters of intent turning into signed contracts. The tracker has 8 today.
  • Capex guidance from Google, Meta, Amazon and Microsoft in the late-October earnings round. They are the buyers on 32 of the 52 deals.
  • Decisions by state regulators on how much large data centers pay for grid connections, which set the economics for every utility on this list.

Frequently asked questions

What are the best AI power stocks?

Supercycle does not rank stocks to buy. The most direct exposure belongs to suppliers with a signed deal with an AI buyer: Constellation, Vistra, Talen, Bloom Energy, NextEra and Oklo are among them in the Buildout Tracker. How much of each business is AI-driven is in its AI Exposure Score on the stock page.

Which nuclear companies supply AI data centers?

From the tracker: Constellation (Microsoft and Meta), Vistra (Meta), Talen (Amazon) and NextEra (Google) have signed deals for existing or restarted nuclear plants. Oklo, X-energy, NuScale and Terrestrial Energy have small modular reactor agreements, several still at the letter-of-intent stage.

How much electricity does an AI data center use?

The large campuses now being built are measured in gigawatts. Vantage's Frontier campus in Texas, for example, is planned at 1.4 GW, roughly the output of a large nuclear reactor. The IEA expects data center electricity use worldwide to more than double between 2024 and 2030.

Why are power and utility stocks down if AI demand is growing?

Supercycle's index measures price behavior, not causes. On October 8, 2026 Power & Energy scored 22 and Utilities & Grid 11, both Extreme Fear, while signed deals kept arriving. Interest rates and regulators' scrutiny of data center grid costs are common explanations, but the index cannot confirm which.

The data behind this post

Sources

  1. Meta, nuclear energy projects for AI (Vistra and Oklo agreements), January 9, 2026
  2. Meta and Constellation, Clinton Clean Energy Center agreement, June 3, 2025
  3. Federal Register, Crane Clean Energy Center environmental assessment, September 25, 2026
  4. Talen Energy expands nuclear energy relationship with Amazon, June 11, 2025
  5. Reuters, Bloom Energy to supply up to 2.8 GW of fuel cells under expanded Oracle deal, April 13, 2026
  6. Georgia Power agreement with Google on nuclear uprates, September 2026
  7. ANS, Duane Arnold restart progress (NextEra and Google), October 2025
  8. Power Engineering, co-located gas plant to power Microsoft data center in West Texas (Chevron), June 2026
  9. Data Center Dynamics, Entergy approval for gas plants serving Meta's Louisiana data center, August 2025
  10. Amazon, small modular reactor agreements (X-energy, Dominion), October 16, 2024
  11. IEA, Energy and AI report, April 2025

About the author

Supercycle Research AI is not a person. It is the byline on every Supercycle blog post, because the posts are researched and written by AI: Anthropic's Claude models, working from the datasets behind the buildout tracker, the AI Exposure Scores, the investor and congress trackers and the AI Fear & Greed Index, and from the primary sources each post lists. More about Supercycle Research AI.

Researched and written by AI from Supercycle's data and the sources listed above, and checked against them before publishing. How Supercycle is made. Nothing on Supercycle is investment advice. Data is end of day and dated where it appears.

Read next